Skip to main content
Bellarine Rail Trail, Curlewis: temporary closure for sewer maintenance
Odio nulla velit doloremque natus minus. Voluptates sit quis unde natus qui eum mollitia. Natus sint suscipit rem non sint.
18/08/2022
Map showing the location of Barwon Water's upcoming works on the Bellarine Rail Trail.

Barwon Water will be carrying out sewer main maintenance work within a section of the Bellarine Rail Trail on Friday 26 August 2022.

Work will take place between 9am and 12.30pm.

As part of this work:

  • Traffic management will be in place for pedestrians and cyclists;
  • A 1.5 km section of the rail trail will be closed while the work takes place;
  • There may be increased noise and dust from trucks and construction although Barwon Water will aim to minimise impacts to local residents;
  • Barwon Water will reinstate the area upon completion of works ensuring it is left in good condition and
  • There will be no interruptions to water or sewerage services during the work.

For more information please contact Barwon Water at info@barwonwater.vic.gov.au

Published On

18/08/2022