Landscape Standards Manual
Incidunt maxime delectus repudiandae reiciendis et molestiae alias facilis labore magnam. Ipsa velit quia quos nemo doloribus perspiciatis fuga sunt. Et sed illum dolor pariatur praesentium illum non adipisci quas. Et dolor quidem maxime sit consectetur maxime enim earum recusandae ipsum. Dolor nobis facere qui dolorem est quos delectus soluta. Molestiae praesentium soluta quam facilis excepturi expedita tempora iusto voluptatem reprehenderit.
Construction works
Prior to the commencement of landscaping works, a pre-commencement meeting must be arranged on site by the Site Superintendent to meet with the Council representative.
Garden beds
A garden bed is defined as a mulched area that may or may not have planting.
Irrigation systems
All works, materials and components associated with the installation of the irrigation system shall conform to relevant Australian Standards, Codes of Practice, Regulations and the requirements of Council’s ‘Irrigation System Installation’ guidelines.
Landscape Standards Manual - Appendices
There are four appendices to this manual.
Miscellaneous works
The Developer is required to present details for the regular up keep of public artworks including materials to be used (for cleaning, coating, painting etc) to maintain an excellent standard of presentation.
Playgrounds and play equipment
All play equipment and fall zones should comply with all relevant Australian Standards including but not limited to AS/NZS 4685, 4422 and 4486.
Practical completion, maintenance and handover
Documentation must be provided to the Council Representative for all hard landscape elements prior to Practical Completion Approval.
Preparatory work
Earthworks - all onsite contractors must perform an underground services check and abide by appropriate Dial before You Dig information.
Tree management
Please note: in relation to tree planting guidelines, locations of existing utilities networks must be obtained from Dial Before You Dig. Telephone 1100 prior to any excavation taking place on public land.
Turf
Nature strip treatment is a requirement of the streetscape landscaping plan approval process.
Water sensitive urban design
The co-location of public open space with stormwater treatment assets presents potential risks to users of reserves.